Water and Sewer
Water and Sewer Projects
The Town of Beech Mountain has undertaken a continuing project to increase water flows for Fire Protection, improve Water Quality, reduce water loss, and improve system longevity. This water and sewer line replacement project is scheduled for completion in September of 2021 for that section of the mountain, the next water and sewer line replacement project will continue in the spring of 2022 and is part of the ongoing Capital Improvement plan for the betterment of the Town entire. We apologize for any inconvenience and ask for you continued support and understanding, as we progress in this and other projects. We are working in many areas of the town on roadways, culverts & ditch lines, utility repairs and many other projects that may cause short time delays, all in effort to improve our infrastructure, roadways, and township. Please call (828) 387-9282 with any further questions.
Studies and Projects
2010 – 2015 Completed Utility Projects
Water and Sewer Study – Marion Rothrocutil_study_2011k, PE
Summary of Services and Rate Fees
Pay Utilities at EasyPay
Utility Account Administrator, Rward@townofbeechmountain.com, (828) 387-4236
Rate Schedule for Water and Sewer
Annual Water and Wastewater Reports
2023 Beech Mountain Water Quality Report
The Town of Beech Mountain publishes annual reports about the quality of our drinking water and our performance in treating wastewater. Please click the links above and below for reviewing a copy of these reports.
FY 22-23 Annual Wastewater Report
New water/sewer connection information
For new service connections System Development Fees will apply, please contact the Building Inspections Department for total applicable fees. 828-387-4236 ext. 113
The Town uses the SDF (System Development Fee) calculator to determine fee amounts. Usage is considered by structure type, i.e., residential, commercial, and sub category. Please contact the Zoning and Building Department for residential or commercial development review by the Zoning Official/Planner or Building Inspector.
The existing tap fees below also apply:
New Connection Charges
Tap | $2,000 water $2,000 sewer |
$1,000 pavement cut fee if applicable |
System Development Fee for Sewer & Water is determined by “Intended Use” Calculator @ 100%- consult Building & Inspections | ||||
Jeff Fish, Building Inspector- jfish@townofbeechmountain.com | ||||
Michael Holland, Building Inspector- mholland@townofbeechmountain.com |
Utilities GIS
Public Works Facility
116 Bark Park Way
Beech Mountain, NC 28604
828-387-9282
Public Services and Utilities Director
Daniel Davis
bmus@townofbeechmountain.com
828-387-9282
Public Works Operations Manager
Matt Clawson
mclawson@townofbeechmountain.com
828-387-9282
Public Services Administration
Chrissy Bonestell, Public Services Administrative Manager
cbonestell@townofbeechmountain.com
828-387-9282
Ashley Browning, Public Services Specialist
abrowning@townofbeechmountain.com
828-387-9282